Chapter 2
phn-0896_009v003
Feb 2010
UNDER DEVELOPMENT
2-1
Chapter 2
Planning considerations
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.
.
.
.
This chapter provides information to help the user to plan a PTP 600 link.
Each frequency variant has specific licensing restrictions that affect frequency range,
channel bandwidth, maximum power and radar avoidance. Link planning must take
account of obstructions, site selection, path loss and wind loading.
The following topics are described in this chapter:
•
•
•
Radar avoidance and bandwidth operation
•
Variable channel bandwidth operation
•
on page
•
•
on page
•
Planning synchronized networks
on page
•
System threshold, output power and link loss
on page
•
on page
To calculate the data throughput capacity of a planned PTP 600 link, see
on page