October 26, 2007
6880309U09-A
6-46
Disassembly/Reassembly Procedures
: Replacement Procedures
4. Attach the Interface Board onto the Main Unit PCB. Then, using a CR-V PH2 torque driver,
fasten the provided taptite screw M2.6X6 to the chassis as shown in
(Torqued to
3.5–4.6 kgf*cm/ 3–4 in. lbs).
Figure 6-87. Installing Interface Board to Chassis
5. Attach the thicker foam on top of the connector of option board as shown in
first removing the adhesive cover.
Figure 6-88. Paste Foam to Option Board
6. Attach the option board to the Interface Board as shown in
.
Figure 6-89. Attach Option Board to Interface Board
Interface Board
Foam
Option Board
OPTION BOARD
Summary of Contents for PM1200
Page 1: ......
Page 2: ......
Page 6: ...iv Notes ...
Page 30: ...October 26 2007 6880309U09 A 2 4 Basic Maintenance Handling Precautions Notes ...
Page 38: ...October 26 2007 6880309U09 A Notes 3 8 Basic Theory of Operation PLL Synthesizer ...
Page 108: ...October 26 2007 6880309U09 A Notes 7 4 Basic Troubleshooting Receiver Troubleshooting ...
Page 134: ...October 26 2007 6880309U09 A Glossary 8 Notes ...
Page 137: ......