6880309U09-A
October 26, 2007
Disassembly/Reassembly Procedures
: Replacement Procedures
6-37
8. Using a CR-V PH2 torque driver, fasten the 2 binding head screws, M3x6 SUS [6] to the
assemble earth plate [33] and the antenna connector [32] to the chassis [11] as shown in
. (Torqued to 3.5–4.6 kgf*cm/
3–4 in. lbs)
Figure 6-68. Sequence for Installing Binding Head Screws on PA-Unit Board Kit
9. Carefully resolder the antenna connector [32] and the earth plate [33] to the PCB as shown in
Figure 6-69. Resoldering Antenna Connector and Earth Plate.
1
2
Earth Plate
Antenna Connector
Summary of Contents for PM1200
Page 1: ......
Page 2: ......
Page 6: ...iv Notes ...
Page 30: ...October 26 2007 6880309U09 A 2 4 Basic Maintenance Handling Precautions Notes ...
Page 38: ...October 26 2007 6880309U09 A Notes 3 8 Basic Theory of Operation PLL Synthesizer ...
Page 108: ...October 26 2007 6880309U09 A Notes 7 4 Basic Troubleshooting Receiver Troubleshooting ...
Page 134: ...October 26 2007 6880309U09 A Glossary 8 Notes ...
Page 137: ......