Issue 1.1 April 2006
Page 37
7.6
Mounting the ODU
s
The ODU mounting bracket is designed to ease installation by fixing the bracket to a pole and
then bringing the ODU into position using a single bolt fixing. The ODU should be mounted
using the following steps ensuring that the cable entry is at the bottom.
The ODU mounting bracket is design to work with poles with diameters in the range 50mm
(2”) to 75mm (3”).
Step 1: Mount the bracket to the pole.
Step 2: Mate the unit to the bracket together
and tighten the nut and bolt.
The enclosure and mounting brackets of the Canopy 150/300 Mb BH product range are
capable of withstanding wind speeds up to 151mph (242kph). The installer should ensure that
the structure the Canopy 150/300 Mb BH is fixed to is also capable of withstanding the
prevalent wind speeds and loads. See Section 13 “Wind Loading”.
The integral safety loop should be used for both hoisting the ODU up a mast or building into
position, and also as a fixing point to secure a permanent safety lanyard from the
tower/building to the ODU in case of mounting failure.
Summary of Contents for Canopy 150 Mbps Backhaul
Page 1: ...Canopy 150 300 Mbps Backhaul User Guide BH150 300 UG en Issue 1 1 April 2006 ...
Page 25: ...Issue 1 1 April 2006 Page 24 Figure 5 Canopy 150 300 PIDU Power Input ...
Page 97: ...Issue 1 1 April 2006 Page 96 Figure 59 Spectrum Management Help Page ...
Page 162: ...Issue 1 1 April 2006 Page 161 Figure A8 Surge Arrestor ALPU ORT Connection Illustration ...