![Motorline professional ROSSO EVO User'S And Installer'S Manual Download Page 7](http://html1.mh-extra.com/html/motorline-professional/rosso-evo/rosso-evo_users-and-installers-manual_1838655007.webp)
7A
7B
100-150mm
125-175mm
13
14
15
16
17
18
EN
EN
FIXING THE MOTOR IN RAILS
AUTOMATISM INSTALLATION
04. INSTALLATION
04. INSTALLATION
With standard rails, you can only automate doors with maximum height of
2500mm.
01
• The steel rail and automatism attachment must be made using the plates and M6
nuts as shown above. Fasten 4 screws, leaving the two in the middle free.
02
• The aluminum rail and automatism attachment must be made using the plates and
M6 nuts and as shown above. Tighten 4 screws, leaving the two in the front free.
01
• Attach the rail’s support plate to the lintel, as visible in the image 15. In the image
16 if can be seen the distance to keep between the gate rail and support plate’s upper
part (125-175mm).
← Note
• If you are unable to fix the
rail to the ceiling for not respecting
the measures above, there should
be created a solid structure to be
able to fix the motor in correct
measurements. This structure may
be fixed to the ceiling as a visible
on the image 17.
02
• Fasten the rail in the fixation plate already attached. To facilitate the task, you can
do it with the rail inclined (motor on the floor / support) which facilitates the installation
since you only have to handle the area of rail to be fixed.
CEILLING
DETAIL 13
DETAIL 14
← Support