47
MB300 XL Pro
rev.0.2 ID03570
In order to load the glue carefully follow the sequence below:
01
Turn on the machine by putting the switch to ON.
02
Check if the indicated pressure in the inlet pressure gauge
is correct.
MIN 6 BAR
03
Open the tap on premelter:
The tap with the lever positioned vertically is open.
04
Set the temperature of the glue tank and glue unit from the
glue unit page(3) according to the glue in the machine or
the amount you want to use.
05
Wait for the heating and temperature stabilization phase.
The timer placed under the stand-by icon will start. When
the timer disappears, stabilization is completed and you
can proceed to the following phase.