Chapter 4 – Mounting of Molift Rail System
Safety regulations
The rail system must be mounted by qualified staff.
Molift is only responsible for the system if the rail system with trolley and/or lifting motor has
been supplied by Molift and is installed by authorised Molift staff.
The lifter’s SWL may NEVER exceed the SWL of the rail system.
There may never be installed more than one lifting motor per rail system.
The SWL of the rail system must be clearly marked.
All rail systems must be provided with end stops and end caps to prevent the trolleys from run-
ning off the system.
Molift recommends the use of anodized rail systems for mounting in connection with swim-
ming pools, owing to the appearance resulting from corrosion.
Molift recommends that annual inspections of the system be carried out according to “Check
points for periodic inspection”.
Please contact a Molift service partner or Molift Group AS in case of defects to the rail system
General information on MRS fitting:
• Molift Group AS recommends that an inspection is carried out before fitting is begun. An in-
spection form is provided on the last page of this manual.
• Fitting is to be carried out in accordance with Molift Group AS’ fitting procedures. These are
found on the following pages in this manual.
• Installations are to always be controlled in accordance with Molift Group AS’ checklists for in-
stallation. The checklist is to be signed by a fitter and be archived by the owner. A copy of the
checklist is archived by Molift Group AS.
Rev E 10/2011
Chapter 4 – Mounting of Molift Rail System
Page 53 of 100
Safety regulations
Summary of Contents for Rail System
Page 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Page 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Page 107: ......
Page 111: ......