![Molift Rail System Project Planning And Installation Download Page 45](http://html1.mh-extra.com/html/molift/rail-system/rail-system_project-planning-and-installation_1824209045.webp)
Figure 49. Trolley Traverse (SWL 300 kg)
Part no.
Description
Part no.
Description
1109550
Trolley Traverse, A.
1109570
Trolley Traverse, A, 50+
1109590
Trolley Traverse, P,
1109580
Trolley Traverse, P, 50+
Trolley for traverse, supplied in sets (2 pieces) ready for mounting with washer, lock nut and multi-
bolt. Available in two heights, low with 50 mm clearance and high with 100 mm clearance (50+),
see figure “Figure 61. Traverse, distance between ceiling and rail” on page 85
Figure 50. Mounting kit, traverse
Part no.
Description
1109345
Mounting kit, traverse mounted underneath the primary rails
1109353
Mounting kit, traverse mounted between primary rails
Mounting kit for traverse, suspended either between or under the boom
Rev E 10/2011
Chapter 3 - Choice of parts and ordering
Page 43 of 100
Schedule of MRS trolleys
Summary of Contents for Rail System
Page 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Page 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Page 107: ......
Page 111: ......