If this is not done according to the above, the screw or in the worst case even the anchor might
loosen and fall out!
Fitting using concrete screws (part no 1109258)
The screw only needs pre-drilling with an Ø1/4” concrete drill bit. It can then be screwed straight
into the concrete.
The screw is available in the following dimensions:
•
Part no. 1109358: 7.5 x 70 mm
•
Part no. 1109359: 7.5 x 125 mm
Measuring up and marking is to be carried out as previously described.
• Drill a Ø1/4” hole to a depth of minimum 65 mm, 3 holes for each bracket
• Use compressed air/pump or brush to remove dust and remnants after drilling.
• Fit the ceiling section of the telescope bracket, tighten to 45 Nm.
The remaining fitting/fitting control steps are carried out as specified in the final fitting stage pro-
cedure.
Rail and final mounting
• Adjust the telescopic part of the bracket temporarily using an M8 set screw on the stem.
• With all brackets correctly mounted, lift up the rail to the bottom of the brackets. Depending
on the length of the path, lifting jacks can be used for this process.
• Mount the rails on the brackets using multibolts (article 1109306) which are locked with Nyloc
locking nuts (article 1120315) and washers (article 1120312). Tighten with 40 Nm.
• Adjust the built-in measures using a laser level. Secure the correct position using an M6 set
screw on the stem of the bracket.
• When the entire path is level at the correct height, drill a hole Ø11 through the stem of the
bracket and secure the built-in using a hex. head bolt Ø10x70 (article 1120371) and Nyloc lock
nut (article 1120315). Tighten with 50 Nm.
Rev E 10/2011
Chapter 4 – Mounting of Molift Rail System
Page 61 of 100
Mounting in concrete with lowered ceiling
Summary of Contents for Rail System
Page 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Page 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Page 107: ......
Page 111: ......