3. Install the four support bushings into the bottom of the Melt-CUBE
manifold and hand tighten. See Figure 19-19.
Figure 19-19 Install bushings
4. Place the Melt-CUBE manifold into the cavity block using M6 lifting bolts.
Figure 19-20 Install Melt-CUBE manifold
IMPORTANT
Ensure that the anti-rotation dowels are inserted to the cavity block cutout,
as shown in “Figure 19-17 Install the anti-rotation dowel” on page 19-25.
Melt-CUBE Design B: Assemble the Melt-CUBE -
continued
19-26
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
MELT-CUBE SYSTEMS
Hot Runner User Manual