
18. Use a box spanner to install the valve insert in the heater body, and
tighten to a torque of 68 N∙m (50 lbf-ft).
19.
Install the inlet tip in the heated body, and tighten to a torque of 61 N∙m
(45 lbf-ft).
20. Attach the gate seal and liner to the nozzle.
21. Attach the nozzle thermocouple.
17-18
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
ACCU-LINE™
Hot Runner User Manual
Summary of Contents for Hot Runner
Page 1: ...Hot Runner User Manual Hot Runner User Manual version 31 Original Instructions...
Page 2: ......
Page 95: ......
Page 318: ......