Zeus200
Installation manual
V 1.0.7 - 12/10/2020
Page 2 of 28
SUMMARY
Safety rules for assembly and operation ......................................................... 5
1.1.3.10 Exemptions from safety and accident prevention requirements ......................... 6
External water pump connection, coolant sensor and provision for flow switch ......... 18
Solar panel / Wind generator connections (optional) ............................................. 19
Secondary battery connections 12V/24V (optional) ............................................... 20