Zeus200
Installation manual
V 1.0.7 - 12/10/2020
Page 12 of 28
2.3
Exhaust gas line
2.3.1
Components list
#
Code
Description
N.
1
Z-05-009
Silencer
1 pc
2
Z-06-007
Discharge pipe 2mt
1 pc
4
Z200-09-008
Discharge through hull
1 pz
9
Z-04-007
Insulating bandage with clamps
1 pz
Envelope #3:
#
Code
Description
N.
3
Z-10-004
Exhaust silencer fixing bracket
1 pc
5
Z-02-008
Steel band 26-28 A4
4 pcs
6
Z-01-013
Screw hexagonal head M6X16 A4
1 pc
7
Z-01-027
Washer 6,6x18x2mm A4
1 pc
8
Z-01-034
Nut M6 A4
1 pz
2.3.2
Mounting instruction
1.
The drain line must be directed towards the stern or the side of the boat. The exhaust line
must not pass under the generator as it may create overheating of the generator itself
2.
Identify a point where to install the hull that is far from any possible contact with people. Pay
attention to install the silicone gasket supplied in order to avoid the contact of the hull pitch
with the resin of the hull
3.
Connect the supplied steel tube (2) of 28mm L2mt. between the Zeus200 generator outlet (C)
and the exhaust silencer (1), as shown in the following diagram. The tube can be stretched up