IPB-5000A
5. Installation and Connection
5-4
(3)
Connecting Voltage Detecting Cable
Connect the Voltage Detecting Cable in the case of using Constant Voltage
Control, Constant Current/Constant Voltage Combination Control and
Constant Power Control.
(4)
Connecting a power supply
Connect Input Cable from
Breaker for Welding Power Input
(See
4.(2)
②
) in
the rear panel of
IPB-5000A
to Earth Leakage Breaker.
Connect the earth cable to
PE
Terminal.
(5)
Connecting a necessary External I/O Signal Cable to Terminal Strip for
External Input/Output Signal
(See
4.(2)
①
)
Prepare cables for the connection, referring to
8.External Interface
.