62
(b) Opening a connection using control data settings
When M1000 is turned on, connection No.1 is opened using control data.
• Devices used
• Program
Device number
Application
SD1282
Open completion signal
SD1284
Open request signal
SD1288
Connection state signal
D100
SP.SOCOPEN instruction control data
M100
SP.SOCOPEN instruction completion device
Setting Execution/
completion type to 8000
H
Setting Application area
to 200
H
(TCP/IP, Active open)
Normal completion
Setting port No. of target
device to 8192
Connection No.1 open
Setting port No. of host
station to 4096
Setting target IP address
to 10.97.85.223
Error completion
Summary of Contents for MELSEC L Series
Page 1: ......
Page 2: ......
Page 19: ...17 CHAPTER 1 OVERVIEW 1 Memo ...
Page 116: ...114 Memo ...
Page 123: ......