- 40 -
Checklist: Checks before commissioning
Checked
Notes
Hot water
Non-return valve
Safety valve
Mixer valve
Is it installed in right direction ?
Is it installed in cold water line ?
Is it installed in right direction ?
Checked
Notes
Heating
System volume
Safety valve
Expansion vessel
Internal heater
Heating system 2
External heat Source
Tank 270
ℓ
+ System ______
ℓ
= Total ______
ℓ
Is FL2 installed ?
Total system volume
5% or more ______
ℓ
Permitted/prohibited (Menu 8.2.1)
Yes
No
<HVĺ7\SHBBBBBB6HWWLQJ0HQXBBBBBB
No
Checked
Notes
Cooling
Pipe system, condensation insulation
Reversing valve (QN12)
Is it installed in right direction ?
Checked
Notes
Refrigerant system
Pipe length (within 12m)
Height difference (within 7m)
Test pressurization
Leak tracing
End pressure Evacuation
______ m
______ m
41.5 bar
-1 bar or lower for one hour
Checked
Notes
Electrical installation
Property’s main fuse
Group fuse
Current limiter/current sensor
3/1 phase ______ A
3/1 phase ______ A
Is it installed properly if the power supply is 3 phase ?
Checked
Notes
Accessories
External circulation pump
Buffer vessel
Relief valve
Room sensor
Yes/No
Yes/No Volume ______
ℓ
Yes/No
Yes/No Type ______
6HWWLQJ0HQX
Start-up and inspection
Control
Summary of Contents for FDCW100VNX
Page 7: ...For Home Owners 6 For Home Owners ...
Page 20: ...Installation 19 Installation ...
Page 42: ...Control 41 Control ...
Page 66: ...System description 65 System description ...
Page 81: ...Service 80 Service ...
Page 148: ...Components 147 Components ...
Page 155: ...Technical data 154 Technical data ...
Page 156: ...Technical data Electrical circuit diagram 155 Electrical circuit diagram HM270V ...
Page 157: ...Technical data Electrical circuit diagram 156 ...
Page 158: ...Technical data Electrical circuit diagram 157 ...
Page 159: ...Technical data Electrical circuit diagram 158 ...
Page 160: ...Technical data Electrical circuit diagram 159 ...