
–
1
–
'14 • KX-SM-200
-
35
-
PUSH
2-step demand input
OFF
OFF
ON
ON
PUSH
PUSH
PUSH
Remote control operation
Remote control display
Air-conditioner operation/stop
Remote
2-step demand control
Normal
Normal
OFF
OFF
ON
ON
Demand control
demand
demand
demand
1st step
2nd step
1st step
Normal
Normal
Demand input
(CnS2)
(CnS1,G1,G2)
Valid(Open)
Invalid(Shorted)
Valid(Open)
Invalid(Shorted)
Normal
Normal
3)
Ending condition
When the starting conditions have been lost.
(c) 2-step demand control
1)
Starting condition
When the “2-step demand input” via the external input terminal of heat source unit (master unit) has become valid.
2)
Contents of control
The demand control is performed at the demand rate which has been set with [SW4-5, SW4-6] and [P04] according
-
to the demand input or the 2-step demand input.
Demand control
Following is assigned to one of P07 - P10.
Demand rate
setting
Demand input
(Function assignment: 1)
2-step demand input
(Function assignment: 9)
None (Normal)
Shorted
Shorted
1st step demand
Open
Shorted
SW4-5, SW4-6
2nd step demand
Open
Open
P04
Invalid
2-step demand ratio can be changed with the 7-segment "P04" on the heat source unit control PCB.
P04 setting
Compressor
output (%)
080(Factory default)
80
060
60
040
40
000
0
OFF
Summary of Contents for FDC1000KXZWE1
Page 171: ... 14 KX SM 200 169 ...
Page 172: ... 14 KX SM 200 170 ...
Page 173: ... 14 KX SM 200 171 ...
Page 174: ... 14 KX SM 200 172 ...