When the power is turned on, the initial processing of the microcomputer is given top priority.
During the initial processing, processing of the operation signal is suspended and is resumed after the initial processing is
completed.
(Initial processing involves data processing by the microcomputer and initial setup of the LEV opening. This process takes up
to two minutes.)
During the initial processing ”
” will appear on the LED monitor on the MAIN board.
Initial Control
-3- Compressor frequency
The maximum frequency will be determined based on the relationship between the water temperature and the outside tem-
perature as well as the ON/OFF status of the Energy-save/Maximum capacity contact.
(The values not on listed in the table are interpolated.)
Control at Start-up
-4- Defrost start/end conditions
Defrost start conditions
Defrost begins when conditions 1) through 3) listed below
are all met.
1) Refrigerant temperature at the air heat exchanger inlet
is at or below the value determined in relation to the
outdoor temperature(*2).
2) Cumulative compressor operation time has reached
35 minutes since the completion of the last defrost op-
eration.
3) Cumulative compressor operation time has reached
35 minutes since the operation-ON signal was sent.
Or the outdoor temperature is -15ºC or below and the
compressor shell bottom SH temperature is at or below
the specified temperature.
Defrost end conditions
Defrost ends when any of the conditions 1) through 4) listed below is met.
1) Maximum defrost time (15 minimum) has been reached. Maximum defrost time is 20% of the cumulative compressor
operation time from the last defrost or from the time operation-ON signal was sent.
2) Three minutes have elapsed since the refrigerant temperature at the air heat exchanger outlet reached 4ºC or above.
3) Low pressure has reached 8.5 MPa or above.
4) High pressure has reached 12.0 MPa or above at the frequency of 30 Hz.
5HIULJHUDQWWHPSHUDWXUHDWWKHDLUKHDWH[FKDQJHULQOHWഒ
2XWGRRUWHPSHUDWXUHഒ
'HIURVWVWDUW
FRQGLWLRQ
0000001906.book 106 ページ 2018年7月19日 木曜日 午前7時22分
Summary of Contents for QAHV-N560YA-HPB
Page 1: ......
Page 7: ...CONTENTS HWE1517A GB 0000001906 book 2 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 9: ... 2 HWE1517A GB 0000001906 book 2 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 21: ... I Read Before Servicing 14 HWE1517A GB 0000001906 book 14 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 23: ... 16 HWE1517A GB 0000001906 book 16 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 53: ... 46 HWE1517A GB 0000001906 book 46 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 65: ... 58 HWE1517A GB 0000001906 book 58 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 77: ... 70 IV Remote Controller GB HWE1517A 0000001906 book 70 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 79: ... 72 HWE1517A GB 0000001906 book 72 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 85: ... 78 HWE1517A GB 0000001906 book 78 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 91: ... 84 HWE1517A GB 0000001906 book 84 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 121: ... 114 HWE1517A GB 0000001906 book 114 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 127: ... 120 HWE1517A GB 0000001906 book 120 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 173: ... 166 HWE1517A GB 0000001906 book 166 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 175: ... X Attachments 168 HWE1517A GB 0000001906 book 168 ページ 2018年7月19日 木曜日 午前7時22分 ...
Page 176: ......