95
OCH750A
OPERATING PROCEDURE
PHOTOS/FIGURES
10. Removing the high pressure switch (63H)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 4)
(4) Remove 3 right side panel fixing screws (5 × 12) in the
rear of the unit and remove the right side panel.
(5) Pull out the lead wire of high pressure switch.
(6) Recover refrigerant.
(7) Remove the welded part of high pressure switch.
Note 1: Recover refrigerant without spreading it in the
air.
Note 2: The welded part can be removed easily by
removing the right side panel.
Note 3: When installing the high pressure switch,
cover it with a wet cloth to prevent it from
heating (100°C or more), then braze the pipes
so that the inside of pipes are not oxidized.
Photo 9
11. Removing the reactor (DCL)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 4)
(4) Remove the reactor fixing screws (4 places, 4 × 10)
Note: The reactor is attached to the rear of the electri-
cal parts box.
Photo10
Reactor fixing screws
Electrical parts box
Reactor fixing screws
Reactor
(DCL)
Lead wire of
high pressure switch
High pressure
switch (63H)
Summary of Contents for PUZ-HA24NHA1
Page 13: ...13 OCH750A 6 OUTLINES AND DIMENSIONS Unit mm in PUZ HA24NHA1 ...
Page 14: ...14 OCH750A Unit mm in PUZ HA30NKA PUZ HA36NKA 1 1 1 ...
Page 15: ...15 OCH750A Unit mm in PUZ HA42NKA1 1 1 1 ...
Page 16: ...16 OCH750A 7 WIRING DIAGRAM PUZ HA24NHA1 ...
Page 17: ...17 OCH750A PUZ HA30NKA PUZ HA36NKA ...
Page 18: ...18 OCH750A PUZ HA42NKA1 ...
Page 127: ...127 OCH750A ...