99
OCH750A
OPERATING PROCEDURE
PHOTOS/FIGURES
3. Removing the electrical parts box
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Disconnect the indoor/outdoor connecting wire and the
power supply wire from terminal block.
(4) Disconnect the connector CNF1, CNF2, SV2, LEV-A,
LEV-B and LEV-C on the controller circuit board.
<Symbols on the board>
• CNF1, CNF2: Fan motor
• LEV-A, LEV-B, LEV-C: LEV
• SV2: Base Heater
(5) Disconnect the pipe-side connections of the following parts.
• Thermistor <Liquid>(TH3)
• Thermistor <Discharge>(TH4)
• Thermistor <2-phase pipe>(TH6)
• Thermistor <Ambient>(TH7)
• Thermistor <Suction> (TH32)
• Thermistor <Comp. surface> (TH33)
• High pressure switch (63H)
• 4-way valve coil (21S4)
(6) Remove the terminal cover and disconnect the compressor
lead wire.
(7) Loosen the clamp for lead wires on the separator.
(8) Remove 2 electrical parts box fixing screws (4 × 10) and
detach the electrical parts box by pulling it upward.
The electrical parts box is fixed with 2 hooks on the left
and 1 hook on the right.
Photo 4
HA30/36
HA42
Electrical
parts box
Electrical
parts box
Controller circuit board (C.B.)
Controller circuit board (C.B.)
Electrical
parts box
fixing screw
Electrical
parts box
fixing screw
Terminal cover
Terminal cover
Compressor
(MC)
Compressor
(MC)
Terminal block
(TB1)
Terminal block
(TB1)
Valve bed
Valve bed
Terminal block
(TB2)
Terminal block
(TB2)
Summary of Contents for PUZ-HA24NHA1
Page 13: ...13 OCH750A 6 OUTLINES AND DIMENSIONS Unit mm in PUZ HA24NHA1 ...
Page 14: ...14 OCH750A Unit mm in PUZ HA30NKA PUZ HA36NKA 1 1 1 ...
Page 15: ...15 OCH750A Unit mm in PUZ HA42NKA1 1 1 1 ...
Page 16: ...16 OCH750A 7 WIRING DIAGRAM PUZ HA24NHA1 ...
Page 17: ...17 OCH750A PUZ HA30NKA PUZ HA36NKA ...
Page 18: ...18 OCH750A PUZ HA42NKA1 ...
Page 127: ...127 OCH750A ...