4
3
3.2
[Fig. 3.2.1]
[Fig. 3.2.2]
Ⓑ
Ⓐ
Ⓐ
Ⓑ
Ⓑ
Ⓑ
Ⓐ
<
Ⓒ
> <
Ⓓ
>
Ⓐ
Within 1.5º
Ⓑ
Drain socket
Ⓒ
Viewed from the front of the control box
Ⓓ
Viewed from the drain socket side
4
4.1
[Fig. 4.1.1]
Ⓑ
Ⓒ
Ⓓ
Ⓔ
Ⓕ
Ⓐ
Ⓐ
Ⓕ
Ⓐ
50
20
Ⓐ
Indoor unit connecting port
Ⓑ
Cutting point : ø9.52 (Liquid side) or ø15.88 (Gas side)
(Indoor unit model : above P50)
Ⓒ
Cutting point : ø6.35 (Liquid side) or ø12.7 (Gas side)
(Indoor unit model : P50 or below)
Ⓓ
Cut the piping at the cutting point
Ⓔ
Have pipe expansion of indoor unit connecting port
Ⓕ
Field pipe
Note:
Remove burr after cutting the piping to prevent entering the piping.
Check that there is no crack at the pipe expansion part.
Ⓐ
Ⓑ
Ⓕ
Ⓒ
Ⓓ
Ⓔ
14
30
(Top view)
30
14
CMB-P1012, 1016V-J
CMB-P108, 1012, 1016V-JA
CMB-P1016V-KA
Ⓐ
Nut (not supplied)
Ⓑ
Double nut (not supplied)
Ⓒ
Hanging bolt ø10 (M10 screw) (not supplied)
Ⓓ
Washer (with cushion) (supplied)
* Attach the cushion facing down.
Ⓔ
Minimum 30 mm
Ⓕ
Washer (without cushion) (supplied)
CMB-P104, 106, 108V-J,
CMB-P104V-KB