- 45 -
(2)-4 Installation method
•
Using the anchoring holes shown below, firmly bolt the unit to the base.
[Fig. IV. 2. (2). 1]
•PWFY unit •Solenoid valve kit
Bases
•
Be sure to install unit in a place strong enough to withstand its weight. If the base is unstable, reinforce with a con
-
crete base.
•
The unit must be anchored on a level surface. Use a level to check after installation.
•
If the unit is installed near a room where noise is a problem, using an anti-vibration stand on the base of the unit is
recommended.
(A) 4-ø14 (Anchoring hole)
(B) (Top view)
(A)
(B)
205
300
450
500
525
Unit : mm
(2)-3-2 PWFY-EP100VM-E1/E2-AU
X
295
265
Model
PWFY-EP100VM-E1-AU
PWFY-EP100VM-E2-AU
Z
106
103
Y
345
353
205
13
X
Y
800
500
525
300
450
Z
47
Unit : mm
(A) 4-ø14 (Anchoring hole)
(B) (Top view)
320
200
(B)
(A)
150
171
207
Unit : mm