Procedure:
NOTICE
Mounting kits are supplied ready to install.
The lift-off protection is in the upper position.
Do not adjust the lift-off protection before inserting the load cell.
Example: PR 95/10
1.
Fit the mounting kit to the vessel foot. It is essential to observe the property classes
and tightening torques of the screws and the property classes of the washers (see
Chapter
2.
Place the vessel and mounting kit in the required position on the foundation/
substructure. Always make sure that the plates are in parallel and seated vertically
above each other.
3.
Mark mounting holes for the lower plate (7).
4. Position the vessel with mounting kit so that drilling can take place.
5.
Fasten the mounting kit to the foundation. It is essential to observe the property
classes and tightening torques of the screws and the property classes of the washers
(see Chapter
6. Equalize the potential (15) between the upper plate (6) and lower plate (7).
5 Installation
Mounting kits PR 95T/00, ../01, ../10, ../11
Minebea Intec
EN-19
Summary of Contents for PR 95T/00S
Page 27: ......