2 - 10
Operator’s Manual
2 System Overview
2.8.2 Installing the Dual-Probe Extend Module
NOTE:
•
Perform the plug and unplug of this module. To reduce the wastage of probe module, the
operation should be conducted under frozen status of the system.
•
If you use this module to connect a probe, the image quality may be degraded.
•
Only use the screws provided with the module, and do not mix different types of screws.
•
After fixing the module using handle screws, fold the handles parallel to the bottom of the
main unit.
1.
Insert the connector to the probe port of the main unit.
2.
Toggle the locking lever of the main unit to the top position.
3.
Use three screws with the same type only to fix the module to the main unit.
4.
Handle screws (×3)
To fix the module to the main unit.
5.
Flat head screws with cross
recess (×3)
To fix the module to the main unit.
NOTE:
If you want to use U-Bank and Dual-Probe extend
module at the same time, please use theses screws to
fix the module.
No.
Name
Description
2
Summary of Contents for Ana
Page 2: ......
Page 50: ...This page intentionally left blank...
Page 60: ...This page intentionally left blank...
Page 110: ...This page intentionally left blank...
Page 116: ...This page intentionally left blank...
Page 166: ...This page intentionally left blank...
Page 176: ...This page intentionally left blank...
Page 194: ...This page intentionally left blank...
Page 220: ...This page intentionally left blank...
Page 288: ...This page intentionally left blank...
Page 304: ...This page intentionally left blank...
Page 308: ...This page intentionally left blank...
Page 316: ...This page intentionally left blank...
Page 337: ......
Page 338: ...P N 046 018835 00 2 0...