4-2
Chapter 4 Installation
Outline
Since this machine is divided into main units, it is easy to transport and install.
Follow the instructions in this chapter for transportation and installation work, and only specialized workers should do.
Aptitude of Workers
When using forklift trucks and cranes at the stage of handling and removal, qualified workers are obliged to work.
Preparing the Installation Site
Foundation work for installing this machine is unnecessary. Just place it on the floor of the secured place.
At the installation site, it is necessary to have a connection to the electrical system and pneumatic system.
Secure the space shown in the figure below around this machine.
* For the direct textile printing model
For the sublimation model, 4400 or more
• It is necessary to identify all the places handling the machine in advance from the place secured for
transportation to the installation place and to check in advance whether there is a danger zone.
• Pay attention to high pressure or high temperature electrical system, liquid or gas conduit. It is manda-
tory to insulate these conduits according to local laws and regulations and to prevent electrification.
• All work is done with utmost care and when lifting it is obligatory to use lifting points and appropriate
equipment as specified. Confirm that there are no people present when lifting the machine or moving it.
When moving, do not pass under or around this machine by anyone.
• Before starting the installation work, make sure that the floor can support the weight of the machine suffi-
ciently.
1500 or more
3600 or more*
1500
or mor
e
1500
or mor
e
Summary of Contents for ML Tiger-1800B MKII
Page 3: ...ii 1 2 2 4 5 6 ...
Page 6: ...v Troubleshooting 9 5 Dismantling 9 27 ...
Page 25: ...Chapter 1 Introduction 1 19 1 2 3 4 5 6 M915601 PC outlet rated label ...
Page 26: ...Chapter 1 Introduction 1 20 ...
Page 38: ...2 12 Chapter 2 Outline explanation ...
Page 50: ...4 10 Chapter 4 Installation ...
Page 120: ...Chapter 6 Basic usage 6 66 ...
Page 140: ...Chapter 7 Operation Adjustment and Maintenance 7 20 ...
Page 174: ... MIMAKI ENGINEERING CO LTD 2020 IG MM Tiger Products Install Pack 2 04 ...