R
Pellerin
Milnor
Corporation
Pellerin
Milnor
Corporation
P.
O.
Box
400,
Kenner
,L
A
70063-0400
Litho
in
U.S.A.
BMP070012/2007225B
(Sheet
4
of
5)
Lo
w
P
rofile
Steam
6458TS1R,
TS1L
STEAM
INLET
STEAM CONDENSA
TE
OUTLET
5,6
7
2,3
4
1
Flanged
connections
and
covers
are
shippped
with
the
machine.
Replace
plugs
with
flanged
connections.
Inst
all
covers
until
final
steam
connections
are
made.
147
Summary of Contents for 7272TG1L
Page 6: ......
Page 8: ...2 ...
Page 46: ...40 ...
Page 47: ...Section 1 Service and Maintenance 41 ...
Page 103: ...Section 2 Drive Assemblies 97 ...
Page 131: ...Section 3 Gas Assemblies 125 ...
Page 148: ...142 ...
Page 149: ...Section 4 Steam Assemblies 143 ...
Page 155: ...Section 5 Pneumatics 149 ...
Page 166: ...160 ...
Page 167: ...Section 6 Door Assemblies 161 ...
Page 176: ...170 ...
Page 177: ...Section 7 Water Assemblies 171 ...
Page 182: ...176 ...
Page 183: ...Section 8 Installation Drawings 177 ...
Page 184: ...178 ...
Page 185: ...179 ...
Page 186: ...180 ...
Page 187: ...181 ...
Page 188: ...182 ...
Page 189: ...183 ...
Page 190: ...184 ...
Page 191: ...185 ...
Page 192: ...186 ...
Page 193: ...187 ...
Page 194: ...188 ...
Page 195: ...189 ...
Page 196: ...190 ...
Page 197: ...191 ...
Page 198: ...192 ...
Page 199: ...193 ...
Page 200: ...194 ...
Page 201: ...195 ...
Page 202: ...196 ...
Page 203: ...197 ...
Page 204: ...198 ...
Page 205: ...199 ...
Page 206: ...200 ...