Page 6
Milltronics Weight Lifter MWL – Instruction Manual
7ML19981CR01
Installation
The Milltronics belt scale must be completely installed before you install the MWL.
Please refer to the belt scale installation manual for installation details.
The MWL installation has eight stages:
• Drilling the crank body mounting holes
• Mounting the crank bodies
• Mounting the torque shaft
• Installing the crank handle
• Testing the unloaded MWL
• Installing the calibration weights
• Testing the loaded MWL
• Shimming the MWL (if required)
1. Drill left and right crank body mounting holes
• Refer to the appropriate MWL installation drawing for your Milltronics belt
scale.
• Measure and mark the locations of the mounting holes for each of the crank
bodies. The left-handed unit turns clockwise to raise weights and the right-
handed unit turns counter-clockwise: handing is marked on the crank bodies.
• Drill these holes as specified for 12mm (1/2") mounting hardware.
Note:
Check that there will be sufficient clearance for the MWL. (See detail, Check
Clearance for Conveyor Belt: page 8.) Clearance can be created artificially by
shimming the idlers in the scale area.
MWL48all.fm Page 6 Tuesday, June 12, 2001 8:23 AM