Page 3 or 34
Lubricate 2 #10x1 self-tapping screws.
Place the screws through the holes in the
bottom of the frame into the holes in the
end of the right most extrusion. Use the
8mm socket to drive in the screws.
Leave
loose.
Continue installing the #10x1
screws in the other 3 extrusions.
Spin the frame around to work from the
other side. Put one drop-in T nut in each
slot with the hole leading. Line up one T
track with the T nuts. Using the 3mm Hex
Key, drive in (4) M5x8 button cap screws.
Leave loose.
Push the t track to the frame.
The hole of the T nut must be closer to
the frame when slid all the way down or
else the T track will not seat all the way to
the frame.
Put one T nut in each slot. Line up one
MDF bed section with the t nuts. Put (4)
split lock washers on (4) M5x16 machine
screws. Using the screwdriver, drive the
screws into the t nuts. Leave loose. Push
the bed section to the back, up against the
T track you previously installed.
Alternate between the remaining T track
and bed sections pushing each back.
On the fifth T track, place the T nuts into
the slot with the hole in the T Nut closest
to the outside. Finish installing the last T
track. Leave everything loose.