Installation
*
I
N
S
T
A
L
L
A
T
I
O
N
*
80
Installing under a continuous work-
top
Risk of electric shock due to ex-
posed cables
There is a risk of coming into contact
with live parts while the lid is re-
moved.
Building under kits* must only be in-
stalled/dismantled by a suitably qual-
ified fitter in accordance with the in-
structions supplied.
– A special
building under kit
* is re-
quired. The cover plate supplied with
the building under kit is used to re-
place the machine lid. It is necessary
to fit the coverplate for electrical
safety reasons.
– Connections for electricity, water and
drainage should be installed in such a
way that they remain accessible
when the machine is in its final posi-
tion.
Fitting instructions are supplied with the
building-under kit.
Washer-dryer stack
The washing machine can be combined
with a Miele tumble dryer in a washer-
dryer stack. The appropriate “WTV”
stacking kit* to match your dryer is re-
quired.
All parts marked* are available from
your Dealer or Miele.
Please note:
a
= at least 2 cm
b
= WTV without drawer: 172 cm
WTV with drawer: 181 cm
c
= 64 cm
Summary of Contents for WCG 660
Page 85: ...85 ...
Page 105: ......
Page 106: ......
Page 108: ...M Nr 11 360 080 00 en GB WCG 660 ...