Supervisor level
74
Delay start
The type of time input for the Delay
start function can be changed or
switched off.
– Off
The Delay start function is not
available for selection.
– End of programme (factory setting)
With the Delay start function, you
specify at what time the programme
should end.
– Start of programme
With the Delay start function, you
specify at what time the programme
should start.
– Time until start
With the Delay start function, you
specify after how many hours a
programme should start (up to 96 h).
Programme name
When selecting a standard
programme, the name of the selected
programme is shown in the display.
– Factory setting: On
When a programme is selected, the
programme name is displayed for a
few seconds before the display
shows the main menu.
– Off
The main menu is displayed
immediately.
Drying level Cottons
Drying level Minimum iron
Drying level Automatic plus
You can alter the drying levels for the
Cottons, Minimum iron, and Automatic
plus
programmes.
Changing this setting leads to increased
energy consumption.
They can be set to one of 7 different
levels.
Factory setting: Normal
Drying level Machine iron
The
Machine iron
drying level in the
Cottons
programme can be
individually adapted.
Changing this setting leads to increased
energy consumption.
You can change the residual moisture in
this programme to one of 11 levels from
16% (drier) to 26% (damper).
Factory setting: 20%