Using for the first time
26
The process for setting up a payment
system is described in “Supervisor level
- Payment system”.
Completing the commissioning
process
The commissioning process is
completed when a programme lasting
longer than 20 minutes has been
carried out in full.
If the power is interrupted prior to the
start of the first drying programme
(e.g. if the machine is switched off
with the
button), the initial
commissioning process can be
completed again. Once a drying
programme has been running for over
20 minutes, the initial commissioning
process cannot be carried out again.
Turn the programme selector to
Special programmes
.
Special
progs
Timed drying
cool air
Basket
programme
Touch the
or
sensor until
Timed
drying cool air
appears.
Touch the
Timed drying cool air
sensor.
0:10
h
0:10
Timed drying cool air
Touch the
sensor.
Duration
0
OK
20
:
h
Touch the
sensor at the top right
until
0:20
appears.
Touch the
OK
sensor.
Touch the flashing
Start/Stop
sensor.
After the programme has finished, the