TASC ROADSIDE SPRAYER SUPPLEMENT

3

R1

V 3.10

ROADSIDE SPRAYER OPERATIONS, TASC MANUAL SUPPLEMENT

NORMAL  SPRAYING WITH PRESSURE BALANCED ROADSIDE SPRAYER

1)

Operate in programmed carrier rate to keep a constant carrier application and
injected chemical application per acre, regarless of speed changes.  (pres-
sures will vary with speed.)

2)

Operate in Automatic pressure control to keep a constant  pressure regard-
less of speed or boom changes.  Chemical injection pumps will respond to
speed and boom changes to keep chemical  rate per acre constant.

3)

Use alternate boom widths to increase injected chemical pump  speed when
spraying significant slope, to account for larger area being covered..

HANDGUN

1)

Operate at a programmed carrier rate to keep  a constant injection pump
speed, regardless of small variations in carrier flow.

2)

Operate carrier valve in manual to keep a constant concentration of chemical,
regardless of all variations in carrier flow.  (Use when feathering trigger on
handgun for example.)

MODES OF OPERATION

TASC roadside operations require, at least, TASC software level 3.10 or above, Slave software
level 3.0 or above, the inclusion of an external handgun function switch, an interface cable and
a flow switch in the handgun feed line.    There are special features of the TASC available to
Roadside Applicators in both the Handgun and Normal modes.  The Handgun option allows the
user to set chemical injection rates based on carrier flow rates,(i.e. ounces per 100 gallons of
carrier or the chemical to carrier ratio, e.g.  gal:gal or oz:oz).  Pumps start and stop in response
to the start of carrier flow sensed by a flow
sensing switch.  Chemical injection will only
occur when the handgun trigger is pulled and
flow is established.

In the Normal mode the TASC can control to
a desired pressure (regardless of speed
changes), responding to the activation of
pressure balanced boom sections found on
certain roadside sprayers.  The Normal mode
also allows selection of alternate widths "B"
or "C" to accomodate changes in sprayed
area due to roadside slopes rather than boom
sections turned on or off.

'B' Width

Normal

Ground Speed

Override

'C' Width

Handgun

Off

Auto

Boom

Switch

Mode

Switch

Ground

Speed

Override

Example 405-0093 Switch Panel

Summary of Contents for Mid-Tech TASC 6000

Page 1: ...DSIDE SPRAYER OPERATIONS TASC MANUAL SUPPLEMENT MIDWEST TECHNOLOGIES INC 2733 E ASH STREET SPRINGFIELD IL USA TEL 217 753 8424 FAX 217 753 8426 999 1512 SOFTWARE VERSION 3 10 Date Code 98084 MID TECH...

Page 2: ...n mode set up functions Handgun mode operate functions Handgun mode special considerations Handgun mode typical operation Handgun mode manual valve override Handgun mode error messages Handgun mode pr...

Page 3: ...F OPERATION TASC roadside operations require at least TASC software level 3 10 or above Slave software level 3 0 or above the inclusion of an external handgun function switch an interface cable and a...

Page 4: ...mp section 4 7 4 in the TASC Manual TEST SPEED Using the INC DEC switch set a test flow rate in gallons per minute this rate is required before pumps can be accurately calibrated SCAN An Err message w...

Page 5: ...w control valve D The initial response of the flow control valve to the selection of the handgun mode is to open fully Once application has started the response of the flow control valve to the flow s...

Page 6: ...ng to the spray boom The TASC console will then be ready for the previously programmed broadcast spraying operations HANDGUN MODE MANUAL VALVE OVERRIDE The flow control valve can be set to a manual ov...

Page 7: ...tion occurs Once the problem is corrected Error 3 Pump is cleared by first selecting Normal and then returning to the Handgun mode on the switch panel Error 4 Error 4 Pump An Error 4 condition indicat...

Page 8: ...IR FIELD REF DATE TIME OPER HANDGUN MODE PRINTER OUTPUT SAMPLES The following two sample printouts show the typical printouts in the HANDGUN MODE The one on the left shows metric units and the one on...

Page 9: ...he INC DEC switch to set the desired pressure You are now set to operate at a predetermined pressure Injection pumps will track boom width changes and speed changes to keep chemical rate per acre cons...

Reviews: