INSTALLATION AND OPERATION MANUAL, GAS FLOOR MODEL
BRAISING PAN WITH MANUAL GEARBOX TILT, GS-30, GS-40, GS-40N, GS-60
2.0 INSTALLATION INSTRUCTIONS
(Continued)
INSTALLATION CODES AND STANDARDS
(Continued)
2.
The appliance must be isolated from the gas supply piping system by closing its
individual manual shut off valve during any pressure testing of the gas supply piping
system at test pressures equal to or less than ½ psi (3.5 kPa).
Electrical grounding must be provided in accordance with local codes, or in the absence of local
codes, with the National Electrical Code, ANSI/NFPA 70, or the Canadian Electrical Code, CSA
C22.2, as applicable.
ANSI/NFPA 96 - (latest edition), “Standard for Ventilation and Fire Protection of Commercial
Cooking Operations,” available from the National Fire Protection Association, Batterymarch
Park, Quincy, MA, USA, 02269.
FLUE CONNECTIONS
Do not obstruct the flow of flue gases from the flue duct located on the rear of the tilting
braising pan. It is recommended that the flue gases be ventilated to the outside of the building
through a ventilation system installed by qualified personnel.
WARNING: ELECTRICAL GROUNDING INSTRUCTIONS
This appliance is equipped with a three-prong (grounding) plug for
your protection against shock hazard and should be plugged
directly into a properly grounded three-prong receptacle. Do not cut
or remove the grounding prong from this plug. (120V units only).
LEVELLING AND ANCHORING
1. Set the appliance in place and level left to right and front-to-back using spirit level.
2. Mark hole locations on floor through anchoring holes provided in flanged adjustable feet.
3. Remove appliance and drill holes in locations marked on floor and insert proper anchoring
devices (not supplied).
4. Set unit back in position and re-level left to right and front to back.
5. Bolt and anchor appliance securely to the floor.
MANUAL 10152R4
9
2021-08-19