Gemini VII 2390 Confirm
Exceptions
Feb 09 Gemini VII 2390 Confirm Installation Instructions and Checklist
73
Exceptions
Procedures categorized as
Fail
should be explained below.
Procedure
Evaluation
Code
Initial/
Date
Analyze the reference material.
Expected results (shown on reference material bottle:)___ ____
Actual results__________________________
The Actual results must match the Expected results, within the specified
tolerance range, in order for this procedure to pass.
P F N/A
Procedure
Comments
Initial/
Date