Gemini VII 2390 Confirm
Connecting Gases
Feb 09 Gemini VII 2390 Confirm Installation Instructions and Checklist
41
4.
Purge the air from the regulator.
a. Turn the regulator control knob clockwise until the low-pressure gauge reads 15 psig
(103 kPag).
b. Turn the regulator shut-off valve counterclockwise to open.
c. Open the gas bottle shut-off valve to flow gas.
d. Close the regulator shut-off valve to stop flow.
e. Close the gas bottle valve.
5. Connect the gas line to the regulator.
a. Connect the gas line to the regulator connector.
b. Use two 7/16-in. (11 mm) wrenches to tighten the gas line connection; one to hold the
fitting steady and one to tighten the connector nut.
Regulator
Shut-Off
valve
Gas Bottle
Shut-Off valve
Low-pressure Gauge