Preparing for a Reference Material Analysis
Gemini VII 2390 Confirm
62 Gemini VII 2390 Confirm Installation Instructions and Checklist
Feb 09
7. Select
Unit [n] > Start Po Measurement
from the main menu to display the Po
Measurement dialog.
Choose one of the following:
a. For Gemini VII 2390
a
units, click
Start
.
b. For Gemini VII 2390
p
and 2390
t
units, click
Po tube
, then click
Start
.
8. The application measures the saturation pressure. When the saturation pressure has been
recorded, the dialog closes.
Preparing for a Reference Material Analysis
1. Place the sample weighing support on the balance. Tare the balance and allow it to
stabilize at zero (0).
2. Place the sample tube set (empty sample tube and stopper) on the sample weighing
support, and place it on the balance.
This area is shown
for Models 2390
p
and
2390
t
only.