PAGE
110
Use the mouse to highlight and click on the required installation. The
Select Installation window will be replaced by the Build Installation
window.
This displays the cost to build the installation, the time it will take to
construct it and the maintenance cost per month. You may click on
the
OK button to abort the build facility operation at this stage.
To construct the new facility, move the mouse pointer over the Base
Display, position the installation and click.
The new installation will now be shown on the Base Display, enclosed
in a dotted line and displaying the number of days of construction
time remaining. The Build Installation window reverts to the Select
Installation window.
Click on the
Cancel button to return to the Bases screen or click on
another installation from the list to continue constructing base
facilities.
A message will appear in the Geoscape screen when a base facility has
been completed.
SECTION
2
UFO Manual E3 for PDF 2/21/97 6:44 PM Page 110