
12
79D0004
Lo-Rider Designer Vent Free Fireboxes
fireplaCe installation
see-throuGh unit (lstf36) installation
1. Attach nailing flanges in desired position.
Figure 16
2. Slide firebox into prepared framing or position firebox in its final position and
frame later.
3. level and plumb firebox by checking edges of firebox. Shim if necessary.
4. Attach nailing flanges to studs.
Figure 17
5. Install canopy.
Refer to Page 15 for canopy installation.
riGht (lrCf36) anD left (llCf36) Corner installation
1. Attach nailing flanges in desired position.
Figure 16
2. Slide firebox into prepared framing or position firebox in its final position and
frame later.
3. level and plumb firebox by checking edges of firebox. Shim if necessary.
4. Attach nailing flanges to studs.
Figure 18
5. Install canopy.
Refer to Page 15 for canopy installation.
Figure 17 -
Location of Nailing Flanges
and Floor Screws
Nailing Flanges
FP2329
nail flange see thru
FP2329
FP2330
nail flang corner
Figure 18 -
Location of Nailing Flanges
and Floor Screws
FP2330
Nailing Flanges