![MG Energy Systems LFP Series Manual Download Page 39](http://html1.mh-extra.com/html/mg-energy-systems/lfp-series/lfp-series_manual_1782740039.webp)
MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands
+31 (0)58 750 89 47 | [email protected] | www.mgenergysystems.eu
Innovation
in energy storage
2.
Lift the aluminium battery pole.
3.
Now the fuse can be checked and replaced with a new one or it can be replaced with a dummy fuse.
If the fuse is replaced with a dummy fuse then clean the dummy fuse’s battery pole with a fine
sanding block. Recommended is to add an electrical joint compound for better conduction.
4.
Before connecting the power cable, the voltage of the battery module needs to be measured to
check if it is the same as the parallel connected batteries. If not then charge/discharge the batteries
separately to the same level.
5.
Connect the power cables with the instructions of chapter 8.4.1.