![MG Energy Systems LFP Series Manual Download Page 26](http://html1.mh-extra.com/html/mg-energy-systems/lfp-series/lfp-series_manual_1782740026.webp)
MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands
+31 (0)58 750 89 47 | [email protected] | www.mgenergysystems.eu
Innovation
in energy storage
Part
Description
A
Isolation foam.
B
Margin space from bottom or floor.
7.4
Electrical
Power cables
Cable lengths need to be taken into account when designing a battery system. Batteries can be placed in
parallel, for example in 24 VDC systems, or in series up to 460 VDC.
NOTICE:
Use the correct cable type for the applicable system voltage.
Use the correct fuses for the applicable cable cross-section.
We recommend to size the cables to limit voltage drop to 1% or less.
NOTICE:
Check the power connections for excessive temperatures during a load test.