ML-54
MevaLite
Assembly, Erection and Stripping
For gang forming:
Formwork shall not be stripped
until the requirements of the
project specifications have been
met. If braces were installed on the
first side only, strip the second side
formwork first.
1. Remove all loose objects such
as tools from the formwork.
2. Mount crane hooks to the gang
to be stripped and remove slack
from lift lines.
3. Remove ties only from gang
being stripped and the assembly
locks connecting it to the adjacent
gang(s).
4. Break bond to cast concrete
using prybars and wedges or other
stripping aids as required.
Caution: never use crane to break
bond.
5. Lift gang and move to next
pour (bracing required), temporary
storage, or disassembly area
(Fig. 54.1).
6. Proceed with stripping the
remaining gangs (Fig. 54.2).
7. Clean formwork as required and
apply form release agent before
next use.
Fig. 54.1
Fig. 54.2
Wall formwork
Technical Instruction Manual / June 2022