background image

P 1

10PTBARK0804-V1

The Berkshire Dog Run 8x4

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a 

Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for up to 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Pressure Treated Timber

Pressure treating is a chemical process which helps to protect wood against adverse weather which could 

lead to rot or insect damage.

The most common chemicals used to pressure treat wood are 

Alkaline Copper Quaternary

 (

ACQ

), 

Copper Azole

 (

CA

), and 

Micronized Copper Quaternary

 (

MCQ

).

Safety: 

Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in 

pressure treated wood, never burn its sawdust or scraps; instead dispose in a landfill.

Summary of Contents for 10PTBARK0804-V1

Page 1: ...avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Our buildings are pre treated with a water based treatment this only helps to protect the product during transit and for up to 3 months against mould To validate your guarantee and ensure longevity of the product it...

Page 2: ...e AI 10BARK548X535 V1F QTY x6 Door Panel AI 10BARK1130X1220 V1DP Door AI 10BARK510X1095 V1D Run Door Panel AI 10BARK1130X1220 V1RP Mesh Door AI 10BARK499X1021 V1MD Right Gable AI 10BARK1074X1218 V1RG Left Gable AI 10BARK1074X1218 V1LG Centre Gable AI 10BARK1074X1218 V1CG Back Panel AI 10BARK1130X974 V1BP QTY 8x4 2 10x4 2 12x4 3 OSB A PI 03 0352 QTY 8x4 2 10x4 2 12x4 3 Floor Tile AI 10BARK548X535 V...

Page 3: ...ONLY Mesh Panel AI 10BARK565X1220 V1MP QTY 8x4 0 10x4 1 12x4 2 OSB B PI 03 0353 10x4 ONLY Cover Trim 12x40x1218mm S1240 1218mm QTY x8 10x4 Kit 18 18 18 18 25 26 Eaves Frame B 28x28x565mm FS2828 565mm QTYx2 Roof support 27x44x1085mm F2744 1085mm Roof Block 27x44x100mm F2744 100mm QTY x2 Nail Bag 28 Framing 44x44x563mm F4444 563mm QTYx2 Framing 28x28x1623mm F2828 1623mm 28 28 Strip 12x95x565mm F1295...

Page 4: ...ews Pre drill hole 70mm screw Pre Assembly Remove the transportation blocks from the bottom of each panel before assembling the building Step 2 Place the Right Gable No 5 and the Back Panel No 8 onto the the base framing and fix together with 3x40mm screws Do NOT fix to the base framing until the Roof is secured 3x40mm screws Pre drill hole 40mm screw Step 3 Fix the Door Panel No 1 with 3x40mm sce...

Page 5: ...No 3 into position and secure with 3x40mm screws per panel Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole 50mm screw Step 6 Place the Central Gable No 7 into position and secure with 3x40mm screws per side The Central Gable fixes to the framing of the panels that make up the Run area Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre d...

Page 6: ...he assembled roof panels to the building with 12x30mm screws per roof sheet Do NOT fix to the base framing until the Roof is secured 24x30mm screws Pre drill hole 30mm screw Step 11 Fix the building to the Base Framing with 50mm screws evenly spaced 24x50mm screws Pre drill hole 50mm screw 11 Step 8 Fix the Centre Framing No 21 to the Centre Gable with 3x40mm screws Do NOT fix to the base framing ...

Page 7: ...position and secure with 3x40mm screws per panel Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole 50mm screw Step 6 Place the Central Gable No 7 into position and secure with 3x40mm screws per side The Central Gable fixes to the framing of the panels that make up the Run area Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole ...

Page 8: ...the Eaves Frame No 19 28 to the Roof OSB No 11 12 with 3x30mm screws per Eaves frame Do NOT fix to the base framing until the Roof is secured 4x30mm screws Pre drill hole 30mm screw 40mm screw Step 11 Fix the assembled roof panels to the building with 12x30mm screws per roof sheet Do NOT fix to the base framing until the Roof is secured 36x30mm screws Pre drill hole 30mm screw Step 12 Fix the buil...

Page 9: ...re with 3x40mm screws per panel Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole 50mm screw Step 6 Place the Central Gable No 3 into position and secure with 3x40mm screws per side The Central Gable fixes to the framing of the panels that make up the Run area Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole 40mm screw Step 7...

Page 10: ...e drill hole 30mm screw Pre drill hole 40mm screw Step 11 Fix the assembled roof panels to the building with 12x30mm screws per roof sheet Do NOT fix to the base framing until the Roof is secured 36x30mm screws Pre drill hole 30mm screw Step 12 Fix the building to the Base Framing with 50mm screws evenly spaced 24x50mm screws Pre drill hole 50mm screw P 9 11 Step 8 Fix the Roof Blocks No 26 to the...

Page 11: ...4 105x Felt tacks Pre drill hole Step 14 Fix the Fascias No 17 to the building with 3x30mm screws per Fascia Some Fascias will need to be cut down to fit 8x4 building shown 8x4 10x4 12x30mm screws 12x4 15x30mmscrews Pre drill hole 30mm screw Step 15 Fix the Cover trims No 18 to the building with 3x30mm screws per Trim The rear Cover trims will need to be cut down to fit A Cover trim is provided fo...

Page 12: ...Door into the door opening and fix into position with 3x30mm screws per hinge 8x4 building shown 12x20mm screws 9x30mm screws Pre drill hole 20mm screw 30mm screw Step 18 Fix a Pad Bolt No 16 to each door make sure to screw through the Door framing Use 8x20mm screws to attach to the Door Mesh Door and 4x30mm screws to attach the Pad Bolt catch to the building Attach a Turn button No 15 to the top ...

Reviews: