P 9
Please retain product label and instructions for future reference
Please retain product label and instructions for future reference
12x4 Run
Step 4
Place the remaining Base Framing
(No. 20, No.23 & No.24)
into position
and secure to each with 2x70mm screws.
*The Run base framing does not fix to
the Kennel area*
**Do NOT fix to the base framing until
the Roof is secured**
4x70mm screws.
Pre drill
hole
70mm
screw
Step 5
Fix a Back Panel
(No. 8)
and a Mesh Panel
(No. 10)
into position
and secure with
3x40mm screws per panel.
**Do NOT fix to the base framing until
the Roof is secured**
6x40mm screws.
Pre drill
hole
50mm
screw
Step 6
Place the Central Gable
(No. 3)
into
position
and secure with 3x40mm screws
per side.
*The Central Gable fixes to the framing
of the panels that make up the Run
area.*
**Do NOT fix to the base framing until
the Roof is secured**
6x40mm screws.
Pre drill
hole
40mm
screw
Step 7
Place the Run Door Panel
(No. 3)
, the
remaining Back Panel
(No. 8)
, Mesh panel
(No. 10)
and the Left Gable
(No. 6)
into
position
and secure with 3x40mm screws
per side.
**Do NOT fix to the base framing until
the Roof is secured**
15x40mm screws.
Pre drill
hole
40mm
screw
8
10
7
20
23
24
10
6
3
8
23