20
19
8
P 5
Please retain product label and instructions for future reference
8x4 Run
Step 4
Place the remaining Base Framing
(No. 17, No. 19 & No. 20)
into position
and
secure to each with 2x70mm screws.
*The Run base framing does not fix to the
Kennel area*
**Do NOT fix to the base framing until the
Roof is secured**
4x70mm screws.
Pre drill
hole
70mm
screw
Step 5
Fix the remaining Back Panel
(No. 8)
and
the Run Door Panel
(No. 3)
into position
and secure with 3x40mm screws per
panel.
**Do NOT fix to the base framing until
the Roof is secured**
6x40mm screws.
Pre drill
hole
50mm
screw
Step 6
Place the Central Gable
(No. 7)
into
position
and secure with 3x40mm screws
per side.
*The Central Gable fixes to the framing
of the panels that make up the Run
area.*
**Do NOT fix to the base framing until
the Roof is secured**
6x40mm screws.
Pre drill
hole
40mm
screw
Step 7
Place the Left Gable
(No. 6)
into position
and secure with 3x40mm screws per side.
**Do NOT fix to the base framing until
the Roof is secured**
6x40mm screws.
Pre drill
hole
40mm
screw
17
3
7
6