Step 8

 

Fix the Roof Blocks 

(No. 26) 

to the    

framing where the two panels meet with 

2x40mm screws per Block.

Secure the Roof support 

(No. 25) 

to the 

blocks with 2x50mm screws. 

*Make sure the Roof support is inline 

with the gable tops*

**Do NOT fix to the base framing until 

the Roof is secured**

2x50mm screws. 

4x40mm screws. 

Pre drill 

hole

50mm 

screw

Step 10

 

Fix the Eaves Frame 

(No. 19 & 28)

 to the 

Roof OSB 

(No. 11 & 12 )

with 3x30mm 

screws per Eaves frame.

**Do NOT fix to the base framing until 

the Roof is secured**

4x30mm screws. 

Pre drill 

hole

30mm 

screw

40mm 

screw

Step 11

 

Fix the assembled roof panels to the 

building with 12x30mm screws per roof 

sheet. 

**Do NOT fix to the base framing until 

the Roof is secured**

36x30mm screws. 

Pre drill 

hole

30mm 

screw

Step 12

 

Fix the building to the Base Framing with 

50mm screws evenly spaced.

24x50mm screws. 

Pre drill 

hole

50mm 

screw

19

Step 9

 

Fix the Centre Framing 

(No. 27)

 to the 

Centre Gable with 3x40mm screws.

**Do NOT fix to the base framing until 

the Roof is secured**

3x40mm screws. 

Pre drill 

hole

40mm 

screw

11

25

27

26

Summary of Contents for 10PTBARK0804-V1

Page 1: ...avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Our buildings are pre treated with a water based treatment this only helps to protect the product during transit and for up to 3 months against mould To validate your guarantee and ensure longevity of the product it...

Page 2: ...e AI 10BARK548X535 V1F QTY x6 Door Panel AI 10BARK1130X1220 V1DP Door AI 10BARK510X1095 V1D Run Door Panel AI 10BARK1130X1220 V1RP Mesh Door AI 10BARK499X1021 V1MD Right Gable AI 10BARK1074X1218 V1RG Left Gable AI 10BARK1074X1218 V1LG Centre Gable AI 10BARK1074X1218 V1CG Back Panel AI 10BARK1130X974 V1BP QTY 8x4 2 10x4 2 12x4 3 OSB A PI 03 0352 QTY 8x4 2 10x4 2 12x4 3 Floor Tile AI 10BARK548X535 V...

Page 3: ...ONLY Mesh Panel AI 10BARK565X1220 V1MP QTY 8x4 0 10x4 1 12x4 2 OSB B PI 03 0353 10x4 ONLY Cover Trim 12x40x1218mm S1240 1218mm QTY x8 10x4 Kit 18 18 18 18 25 26 Eaves Frame B 28x28x565mm FS2828 565mm QTYx2 Roof support 27x44x1085mm F2744 1085mm Roof Block 27x44x100mm F2744 100mm QTY x2 Nail Bag 28 Framing 44x44x563mm F4444 563mm QTYx2 Framing 28x28x1623mm F2828 1623mm 28 28 Strip 12x95x565mm F1295...

Page 4: ...ews Pre drill hole 70mm screw Pre Assembly Remove the transportation blocks from the bottom of each panel before assembling the building Step 2 Place the Right Gable No 5 and the Back Panel No 8 onto the the base framing and fix together with 3x40mm screws Do NOT fix to the base framing until the Roof is secured 3x40mm screws Pre drill hole 40mm screw Step 3 Fix the Door Panel No 1 with 3x40mm sce...

Page 5: ...No 3 into position and secure with 3x40mm screws per panel Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole 50mm screw Step 6 Place the Central Gable No 7 into position and secure with 3x40mm screws per side The Central Gable fixes to the framing of the panels that make up the Run area Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre d...

Page 6: ...he assembled roof panels to the building with 12x30mm screws per roof sheet Do NOT fix to the base framing until the Roof is secured 24x30mm screws Pre drill hole 30mm screw Step 11 Fix the building to the Base Framing with 50mm screws evenly spaced 24x50mm screws Pre drill hole 50mm screw 11 Step 8 Fix the Centre Framing No 21 to the Centre Gable with 3x40mm screws Do NOT fix to the base framing ...

Page 7: ...position and secure with 3x40mm screws per panel Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole 50mm screw Step 6 Place the Central Gable No 7 into position and secure with 3x40mm screws per side The Central Gable fixes to the framing of the panels that make up the Run area Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole ...

Page 8: ...the Eaves Frame No 19 28 to the Roof OSB No 11 12 with 3x30mm screws per Eaves frame Do NOT fix to the base framing until the Roof is secured 4x30mm screws Pre drill hole 30mm screw 40mm screw Step 11 Fix the assembled roof panels to the building with 12x30mm screws per roof sheet Do NOT fix to the base framing until the Roof is secured 36x30mm screws Pre drill hole 30mm screw Step 12 Fix the buil...

Page 9: ...re with 3x40mm screws per panel Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole 50mm screw Step 6 Place the Central Gable No 3 into position and secure with 3x40mm screws per side The Central Gable fixes to the framing of the panels that make up the Run area Do NOT fix to the base framing until the Roof is secured 6x40mm screws Pre drill hole 40mm screw Step 7...

Page 10: ...e drill hole 30mm screw Pre drill hole 40mm screw Step 11 Fix the assembled roof panels to the building with 12x30mm screws per roof sheet Do NOT fix to the base framing until the Roof is secured 36x30mm screws Pre drill hole 30mm screw Step 12 Fix the building to the Base Framing with 50mm screws evenly spaced 24x50mm screws Pre drill hole 50mm screw P 9 11 Step 8 Fix the Roof Blocks No 26 to the...

Page 11: ...4 105x Felt tacks Pre drill hole Step 14 Fix the Fascias No 17 to the building with 3x30mm screws per Fascia Some Fascias will need to be cut down to fit 8x4 building shown 8x4 10x4 12x30mm screws 12x4 15x30mmscrews Pre drill hole 30mm screw Step 15 Fix the Cover trims No 18 to the building with 3x30mm screws per Trim The rear Cover trims will need to be cut down to fit A Cover trim is provided fo...

Page 12: ...Door into the door opening and fix into position with 3x30mm screws per hinge 8x4 building shown 12x20mm screws 9x30mm screws Pre drill hole 20mm screw 30mm screw Step 18 Fix a Pad Bolt No 16 to each door make sure to screw through the Door framing Use 8x20mm screws to attach to the Door Mesh Door and 4x30mm screws to attach the Pad Bolt catch to the building Attach a Turn button No 15 to the top ...

Reviews: