Please retain product label and instructions for future reference
Please retain product label and instructions for future reference
P 9
Step 16
To fix the kennel Door to the building,
attach the hinges to the Door
(No. 2)
with
4x20mm screws per hinge.
Pawsition the Door into the door opening
and fix into position with 3x30mm screws
per hinge.
**8x4 building shown**
12x20mm screws
9x30mm screws
Pre drill
hole
20mm
screw
30mm
screw
Step 17
To fix the Run Door to the building, attach
the hinges to the Mesh Door
(No. 4)
with
4x20mm screws per hinge.
Pawsition the Door into the door opening
and fix into position with 3x30mm screws
per hinge.
**8x4 building shown**
12x20mm screws
9x30mm screws
Pre drill
hole
20mm
screw
30mm
screw
Step 18
Fix a Pad Bolt
(No. 16)
to each door. make
sure to screw through the Door framing.
Use 8x20mm screws to attach to the
Door/Mesh Door and 4x30mm screws to
attach the Pad Bolt catch to the building.
Attach a Turn button
(No. 15)
to the top
and bottom of each door. 1x20mm screw
per Turn Button.
**8x4 building shown**
20x20mm screws
8x30mm screws
Pre drill
hole
20mm
screw
30mm
screw
Step 19
Place the Floor tiles
(No.13)
into the
kennel area as shown.
These panels are removeable so do not
need securing in position.
*For ease of use, Drill a finger sized
hole in one tile.
**8x4 building shown**
4
14
2
16
15