Please retain product label and instructions for future reference
P 8
Step 19
Parts needed - No. 21 QTY 2
No. 22 QTY 1
On the inside of the building fix
the Door Frame Strips
(No. 21
& 22)
, to the top and sides of
the doors frames. Make sure
that the edges are flush with
the edge of the framing. Fix
with 4x30mm screws per strip.
12x30mm Screws
Pre drill
hole
30mm
screw
22
21
21
22
21
It is ESSENTIAL that you apply wood treat-
ment immediately after the building has
been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back