background image

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Pre drill 

hole

20mm           

screw

Please retain product label and instructions for future reference

             

24

Step 21

Fix the casement say to the

window then align the fixings

to the window panel.

*Ensure the casement stay fits

onto the fixings before securing

in place.

12x20mm Screws

30mm 

screw

Pre drill 

hole

Flat head
Grub Screw

2x30mm screw

Screws provided with lock
Do not over tighten the screws

Step 20

Rim lock fixing

Fig 1.  (internal view)

Place the lock onto internal horizontal 

framing ensure alignment with the 

pre drilled holes before fixing. Align 

Lock keep with lock and fix with 

screws provided.

Do not over tighten the screws, 

otherwise the locking mechanism will 

not work.

Fig 2. 

Place door handle bar through the 

lock as in diagram, fix door handle 

onto bar with the flat headed grub 

screw.

Fig 3. (External view)

Fir the door handle cover over the bar 

and fix with 2x30mm screws 

provided. Fix the door handle onto 

bar with the flat headed grub screw 

as in diagram.

2x30mm Screws

21

26

Step 22

Attach the turn buttons to the top

and bottom of the slave door using

1x30mm black screw per turn

button. 

*Ensuring the turn buttons catch

the master door.

2x30mm Black Screws

These Turn buttons help to keep

your doors straight during high

and low levels of moisture

content in the air.

30mm 

screw

Pre drill 

hole

Summary of Contents for 01GRODB1008-V3

Page 1: ...based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is...

Page 2: ...x16 16mm Screws x14 Pre Assembly Remove transportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 P 2 01GRODB1008 V3 Overall Dimens...

Page 3: ...r panel framing as shown in the illustration and fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw 15 14 14 Step 3 Fix the door strips onto the front gable using 4x30mm screws for...

Page 4: ...and instructions for future reference Please retain product label and instructions for future reference Pre drill hole Pre drill hole Step 7 Place the cover strip 13mm above the gap in the window pan...

Page 5: ...a tongue and groove fixing 8x50mm Screws 8 8 Step 9 Place the assembled plain gable and first plain side onto the floor and fix in place Fix the corners with 50mm screws Do not secure the building to...

Page 6: ...e lrg roofs onto the gables as shown in the illustration Ensure the roof framing sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm screws per r...

Page 7: ...a boards to the front and rear of the building using 3x40mm screws per fascia Ensure to screw through the boards into the framing 24x40mm Screws Pre drill hole 40mm screw Step 18 Fix the barge boards...

Page 8: ...ernal horizontal framing ensure alignment with the pre drilled holes before fixing Align Lock keep with lock and fix with screws provided Do not over tighten the screws otherwise the locking mechanism...

Reviews: