background image

Step 1

Lay the Door Panel and Gable Top on a level 

floor place the gable top on top of the door 

panel ensure they are level at the top then fix 

together using 60mm screws. Stagger the 

screws so they do not collide.

8x60mm Screws

Pre drill 

hole

60mm 

screw

5

1

12

Step 2

Line a Gable Strip up to the assembled 

gable  ensuring the bottom of the strip 

lines up with the underneath of the 

door panel framing as shown in the 

illustration and fix in place using 40mm 

screws.

6x40mm Screws

Pre drill 

hole

40mm 

screw

15

14

14

Step 3

Fix the door strips onto the front gable 

using 4x30mm screws for each strip

12x30mm Screws

Pre drill 

hole

30mm 

screw

6

7

25

Step 4

Fix the T Hinges onto the doors and door 

frame as shown above. Ensure that each 

hinge is 720mm apart and that there is a 1

70mm gap from the top of the door and the 

middle screw of the T Hinge.

42x30mm Screws

Pre drill 

hole

30mm 

screw

P 3

01GRODB1008-V3

Please retain product label and instructions for future reference

             

Summary of Contents for 01GRODB1008-V3

Page 1: ...based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is...

Page 2: ...x16 16mm Screws x14 Pre Assembly Remove transportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 P 2 01GRODB1008 V3 Overall Dimens...

Page 3: ...r panel framing as shown in the illustration and fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw 15 14 14 Step 3 Fix the door strips onto the front gable using 4x30mm screws for...

Page 4: ...and instructions for future reference Please retain product label and instructions for future reference Pre drill hole Pre drill hole Step 7 Place the cover strip 13mm above the gap in the window pan...

Page 5: ...a tongue and groove fixing 8x50mm Screws 8 8 Step 9 Place the assembled plain gable and first plain side onto the floor and fix in place Fix the corners with 50mm screws Do not secure the building to...

Page 6: ...e lrg roofs onto the gables as shown in the illustration Ensure the roof framing sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm screws per r...

Page 7: ...a boards to the front and rear of the building using 3x40mm screws per fascia Ensure to screw through the boards into the framing 24x40mm Screws Pre drill hole 40mm screw Step 18 Fix the barge boards...

Page 8: ...ernal horizontal framing ensure alignment with the pre drilled holes before fixing Align Lock keep with lock and fix with screws provided Do not over tighten the screws otherwise the locking mechanism...

Reviews: