background image

HANDLE

WITH CARE

1

2

3

4

Felt 

tacks 

*Felt size: 3155mm

P 6

Please retain product label and instructions for future reference

             

Please retain product label and instructions for future reference

             

Step 12

Place the sml roofs onto the gables

as shown in the illustration.

*Ensure the roof framing sits into

the cut out sections and rest on 

the framing.

Fix each sml roof section to the 

gable using 4x30mm screws

per roof panel.

8x30mm Screws

Pre drill 

hole

30mm           

screw

9

10

10

9

Step 13

Place the lrg roofs onto the gables

as shown in the illustration.

*Ensure the roof framing sits into

the cut out sections and rest on 

the framing.

Fix each sml roof section to the 

gable using 7x30mm screws

per roof panel.

14x30mm Screws

Pre drill 

hole

30mm           

screw

Rafter

Roof 

panel

100mm 
intervals

50mm 
Overhang

50mm 

screw

Pre drill 

hole

Step 14

 

Once the roof is fixed secure

 

the building to the floor with

 

36x50mm screws.

36x50mm Screws

b

b

b

b

b

b

b

b

Step 15

Cut the felt into 4 sheets &

lay onto the roof as shown

in the illustration below,

ensuring there is 

approximately 50mm of

overhang around the 

building. 

Secure the felt into place

using 190x felt tacks at

100mm intervals.

190x Felt tacks

Summary of Contents for 01GRODB1008-V3

Page 1: ...based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is...

Page 2: ...x16 16mm Screws x14 Pre Assembly Remove transportation blocks from the bottom of each panel before beginning assembly Each Panel should have two blocks 20mm Screw x22 P 2 01GRODB1008 V3 Overall Dimens...

Page 3: ...r panel framing as shown in the illustration and fix in place using 40mm screws 6x40mm Screws Pre drill hole 40mm screw 15 14 14 Step 3 Fix the door strips onto the front gable using 4x30mm screws for...

Page 4: ...and instructions for future reference Please retain product label and instructions for future reference Pre drill hole Pre drill hole Step 7 Place the cover strip 13mm above the gap in the window pan...

Page 5: ...a tongue and groove fixing 8x50mm Screws 8 8 Step 9 Place the assembled plain gable and first plain side onto the floor and fix in place Fix the corners with 50mm screws Do not secure the building to...

Page 6: ...e lrg roofs onto the gables as shown in the illustration Ensure the roof framing sits into the cut out sections and rest on the framing Fix each sml roof section to the gable using 7x30mm screws per r...

Page 7: ...a boards to the front and rear of the building using 3x40mm screws per fascia Ensure to screw through the boards into the framing 24x40mm Screws Pre drill hole 40mm screw Step 18 Fix the barge boards...

Page 8: ...ernal horizontal framing ensure alignment with the pre drilled holes before fixing Align Lock keep with lock and fix with screws provided Do not over tighten the screws otherwise the locking mechanism...

Reviews: